🔥 Join the Fire Safety Movement! 🔥             Help us Spread Awareness about Passive Fire Protection and Prevent Fire Accidents!            Partner With Us to Educate Communities and Businesses About the Vital Role of Passive Fire Safety.           "Discover Insights, Latest Developments, and Best Practices in Passive Fire Safety."           “PASSiVE FIRE SAFE INDIA” Purely Dedicated on Passive Fire Safety.            An Unique Platform for B2b and B2c Magazine for the Passive Fire System.
Time :
Blogs / Published in January - February 2024 Edition

Serious Inconsistencies when Installing Passive Fire Protection

Overview

An onsite fire engineer, engaged on behalf of the end client during the construction of a new residential development, reports a significant amount of inadequately installed passive fire protection elements.

Key Learning Outcomes
For Principal Contractors and Clients:
  • Ensure that fire protection work is carried out in accordance with the designed fire strategy.
  • The engagement of specialist fire protection contractors is likely to be necessary for work recognised to be specifically related to fire protection.
  • Other work, such as the fitting of door sets, may also be critical in terms of fire safety.

This report relates to a project involving the construction of a new residential development comprising numerous blocks of flats.

The reporter’s role was to act as the onsite fire engineer engaged throughout the construction period for approximately two years. Their role was to ensure that the works carried out were consistent with the requirements agreed in the fire strategy and relevant standards, and that the quality of work satisfied the functional requirements of the Building Regulations.

The reporter suggests that the project faced numerous challenges where, in their view, unqualified contractors carried out the installation of life safety elements, resulting in potential risks to the future building occupiers as well as creating significant delays.

The contractors carrying out the works were not aware of the intended function of these details or systems and lacked the necessary, demonstrable competence whilst undertaking site visits at different phases of the construction, the reporter identified a significant amount of inadequately installed elements of passive fire protection. Specialist fire stopping installers had been appointed to the project; however, in the opinion of the reporter, it soon became clear that the installation of certain details was carried out by various parties who did not have any specific qualifications nor could correctly record and document the executed works. This meant they failed to follow the principles of the golden thread, which the client intended to adopt.

Furthermore, the contractors carrying out the works were not aware of the intended function of these details or systems and lacked the necessary, demonstrable competence.

Most fire stopping details, such as pattresses and proprietary seals, were installed by third party accredited, fire stopping installers; these details were generally of an acceptable standard.

However, other fire stopping details, for example within plasterboard partitions, were installed by dry lining operatives with no appropriate accreditation or expertise in fire stopping. Some of the reporter’s key findings are summarised below:

  • Inadequate products were used which would not perform correctly in the installed arrangement.
  • Products from different manufacturers were inappropriately mixed with each other, thus not meeting any standard (tested and certified) installation detail.
  • Products that may have been appropriate were installed incorrectly, essentially creating a breach in the fire resisting element.
  • Fire protection elements such as intumescent putty pads behind electrical sockets, smoke seals of fire doors along the escape routes, and linear joint seals, were found to be missing altogether.
  • Fire resisting door sets were inadequately installed, either by not adopting a specific detail or because installation was based on architectural drawings which were subject to significant alterations from the tested detail without any supporting information.
  • Fire dampers were not appropriately installed and gaps were observed around the items.
  • Plasterboard partitions did not include an adequate head detail to accommodate any slab deflections during a fire.
  • Other non standard details were used without documented evidence of their suitability.

The construction included numerous service penetrations, or openings through fire resisting partitions, which were inadequately sealed, thus creating breaches through various fire resisting elements. These included compartment walls between flats, protected corridors, and protected entrance halls.

Eventually, the reporter advised the client not to proceed with the handover of the building until all issues had been resolved.

The reporter goes on to explain that at various stages of the process, different stakeholders and technical specialists were involved in discussions to try and justify the inappropriate works that had already been completed. However, the reporter asserts that the arguments were purely qualitative and product manufacturers were unwilling to provide any sort of guarantee for non-standard details retrospectively to reflect the works onsite. This resulted in difficult conversations and eventually, the reporter advised the client not to proceed with the handover of the building until all issues had been resolved.

In principle, it would be expected that any fire stopping or passive fire protection works are carried out by competent professionals. This is similar to the expectation that masonry partitions would be constructed by bricklayers, building services would be installed by mechanical or electrical engineers. Whilst it is not a legal requirement for third party accredited installers to carry out these works, there is an obligation that the systems function as intended and are suitable from a workmanship perspective, as indicated in Regulation 7 of the Building Regulations.

Following the Grenfell Tower tragedy, the construction industry is undergoing a significant culture change, where more emphasis is placed on life safety and ensuring that buildings are safe to be occupied. In the reporter’s opinion, there is still a long way to go. There is a need for everyone involved in the construction industry to raise the bar and not accept compromises on safety aspects that can have a significant impact in the long term.

It is important that people are accountable for their work and a concise record is maintained of all life safety elements, not only to assure the end client of the safe condition of the building, but also to ensure the building can be appropriately maintained throughout its lifetime.

Ensuring continuity in the design process by following the principles of the golden thread of information is crucial. It is also key that fire engineers are involved throughout all design and construction stages up to handover to mitigate risks and ensure that the fire safety principles are correctly adopted. The importance of third party accreditation, quality assurance and accurately recording evidence should also be emphasised. These provide assurance of the competence and quality of workmanship of contractors carrying out the works.

The 4th Edition of Fire Directory

Passive Fire Magazine

Newsletter

Aliqu justo et labore at eirmod justo sea erat diam dolor diam vero kasd

Sit eirmod nonumy kasd eirmod

About Us

With a very different concept, the magazine received tremendous and positive response. Passive Fire Safe India is the first magazine covering the Passive Fire segment. Passive fire protection involves Read More..

© Passive Fire Safe India. 2024-25 All Rights Reserved. Designed by VMH Web Solutions